Preserve the past, make room for the future
Kappa Kappa Gamma came to us shortly before the OSU summer break with some severe siding issues. Upon inspection, we could see that the siding was failing, the membrane roofs were leaking, and some gutters were failing. We made some room in our busy summer schedule to address the critical issues so the students could move back into a safe building in fall. Over the winter, we designed a new breakfast kitchenette and changed some of the interior layout. The new space has a nicer flow, is easier to use, and accommodates their guests much better. We also installed an ADA bathroom. At the same time as the interior work was being done, we completely stripped the exterior siding and membrane roofing. This offered a great opportunity to insulate the walls of the building. Then we added modern housewrap, flashing, siding and paint. We also cleaned and resealed the brick.
Project Details
GCCI Cabinetry
These durable, commercial grade cabinets were built in G. Christianson Construction's custom cabinet shop. By managing every step of this project, we were able to build, finish, and install custom cabinetry in under one month. This tight schedule was necessary to allow time for the other phases of the project. Our projects for fraternities, sororities and other university housing all have to be finished over the three month OSU summer break.
Resilient Quartz Countertops
These budget quartz countertops are just as stain resistant, durable and cleanable as name brand products. Undercabinet lighting makes for an excellent work space.
History Preserved
The original siding on this sorority was rotten and failing. Our philosophy was to emphasize the historic nature of a building without sacrificing durability. Using modern, waterproof materials like James Hardie Panel Siding, and Boral trim, we re-created the original facade with siding that will last a lifetime.
What our Clients are Saying
“Larry's cedar deck had reached the end of it's life, the handrails were literally falling off. We rejuvenated it with new Trex and were able to reuse the tall telephone poles that support it. ”
Carl Christianson, Superintendent and Owner
See the Second Story Trex Deck project“Bill and Tammy were very happy with our work on their home in Corvallis, so when they bought their home in Philomath, they asked us to create a special Guest Suite for them.”
Carl Christianson, Owner
See the Guest Suite Addition projectSee the Mary’s River Bathroom Addition project“My husband and I couldn’t be happier with the master bedroom/bath remodel undertaken recently for us by G. Christianson Construction. I had a vision and Carl helped make it a reality. Everyone on the G. Christianson team is absolutely top-notch in terms of skills, and just in general being lovely people to have around. Carl seems to have a knack for finding and securing the talents of the best subcontractors, too. We are thrilled with the results of the project. In fact, I would say it turned out even better than we imagined and hoped!”
