Witham Village Footbridge

Witham Village Footbridge

Witham Village Footbridge

Commercial | Decks & Exteriors

  • Witham Village Footbridge
  • Witham Village Footbridge
  • Witham Village Footbridge
  • Witham Village Footbridge
  • Witham Village Footbridge

Witham Village Apartments approached us to replace their old footbridge connecting the different sides of the complex because it was falling into the Creek. Read More

Stars

“G Christianson Construction were responsive, timely, and effective throughout the process. Our project was more challenging than most as it was the construction of a footbridge across Dixon Creek. I highly recommend Jon and his team to you!”

Katie Gonzalez

Witham Village Apartments Management

WVF-Witham-Feature-Under-Rail-Lighting

Under-Rail Lighting

Lighting was added just below the handrail to improve the curb appeal and for safety when using the bridge after the sun goes down.

Abutment CLSM Footings

Abutment CLSM 57″ x 24″ x 96″ Footings were used to prevent the bridge from deteriorating the bank like the previous footbridge.

WVF-Witham-Feature-Abutment-CLSM-Footings
WVF-Witham-Feature-Durable-Materials

Durable Materials

Pressure-treated glulam beams, pressure-treated lumber, composite decking, and matching composite handrails were used to ensure the best longevity.

Services Provided

Complete Footbridge Reconstruction

  • Under-rail lighting
  • Abutment CLSM Footings
  • Pressure-treated glulam beams
  • Pressure-treated lumber
  • Composite decking and handrails
WVF-Witham-Feature-Services-Provided

House Shape

Have a Project in Mind? Let’s Talk